OP 10
WO-2026-000146-010-OP030-159
OP030 | Bunching / Double Twist
Work Centre: |
Machine: F03-M05 | Cabling Machine
Planned
Start:
Finish:
Qty: 1015.000000 kg
Target Speed
232323 m/min
Output / Semi-Finished
Output Qty
m
Setup / Duration
3434324 min / 234324 min
Scrap
55555 %
TECHNICAL / ENGINEERING PARAMETERS
| Parameter | Required / Target | Min | Max | Unit | Remarks |
| Material Type | ADSAD | | | | |
| Construction | SADSAD | | | | |
| Conductor Stranding Type | | | | | |
| Layer Diameters for Rolling | | | | | |
| Lay Direction | | | | | |
| Diameter | | | | | |
| Nominal Lay Length | | | | | |
| Maximum Lay Length | | | | | |
| Theoretical Conductor Resistance | | | | | |
| Maximum Conductor Resistance | | | | | |
| Maximum Standard Resistance | | | | | |
| Material Weight (kg/km) | | | | kg/km | |
| Note | AD | | | | |
| Lay Type | | | | | |
| Minimum Lay Length | | | | | |
| Lay Ratio | | | | | |
| Minimum Diameter | | | | | |
| Nominal Diameter | | | | | |
| Maximum Diameter | | | | | |
| Filler Cord Count | | | | | |
| Filler Cord Diameter | | | | | |
| Dummy Core Count | | | | | |
| Dummy Core Diameter | | | | | |
| Filler Cord Material | | | | | |
| Filler Cord Weight | | | | | |
| Yarn Material | DASD | | | | |
| Yarn Weight | | | | | |
| Color and Number Sequence | | | | | |
PRODUCTION PROCESS PARAMETERS
| Parameter | Required / Target | Min | Max | Unit | Remarks |
| Bow / Rotor Speed | | | | rpm | |
| Line Speed | | | | m/min | |
QUALITY / TEST PARAMETERS
| Parameter | Required / Target | Min | Max | Unit | Remarks |
| Conductor OD | | | | mm | |
RAW MATERIALS / COMPONENTS — THIS OPERATION ONLY
—
Operator
Name / Sign:
Actual Start / Stop
Actual Output / Scrap
QC / Supervisor
Name / Sign: